Menu
idnbonds

Pelabuhan Indonesia Loading and Unloading Process

By administrator | November 9, 2020 | Infrastructure Transportation

Pelabuhan Indonesia Loading and Unloading Process. PT Pelabuhan Indonesia II (Persero) or IPC. Report an increase in container flows of 11.28 percent in September 2020. In line with the trend of loading and unloading traffic in the July – September period or Quarter III / 2020. IPC President Director, Arif.

Read More...

Super Holding Company to Replace SOE

By administrator | November 9, 2020 | Infrastructure Transportation

Super Holding Company to Replace SOE. PT Angkasa Pura II (Persero) state the company’s plan. After the tourism and aviation BUMN holding was form. President Director of Angkasa Pura II Muhammad Awaluddin said. The company would be under the parent company of PT Penas Air Survey. Holding creates a single.

Read More...

WSKT Builds Twin Tower CPI Makassar

By administrator | November 9, 2020 | Property Real Estate

WSKT Builds Twin Tower CPI Makassar. PT Waskita Karya Tbk (WSKT) is trust by PT Sulsel Citra Indonesia (Perseroda) to build an iconic building with the philosophy of a phinisi ship in the center of Makassar City. South Sulawesi, worth IDR 1.9 trillion. Which will be designate as offices for the provincial.

Read More...

PPRO Cleanliness Health Safety and Environmental

By administrator | November 9, 2020 | Property Real Estate

PPRO Cleanliness Health Safety and Environmental. PT PP Properti Tbk (PPRO) received a rating from PT Pemeringkat Efek Indonesia (Pefindo). With an idBBB- rating for the company and its Bond I Year 2016. Pefindo also gave an idBBB- rating for Sustainable Bonds II Year 2020. Worth a maximum of Rp 2.4.

Read More...

Puradelta Lestari Sales Backlog Ratio

By administrator | November 9, 2020 | Property Real Estate

Puradelta Lestari Sales Backlog Ratio. Issuer property PT Puradelta Lestari Tbk. said that the record income fell at the end of the third quarter of 2020 due to the high record income in the same period last year. In addition, the company’s sales backlog is quite high. And has not been include in the revenue.

Read More...

Progressive Scheme of Taxation Support LSIP

By administrator | November 6, 2020 | Agriculture

Progressive Scheme of Taxation Support LSIP. The government plans to increase export duty rates with a progressive scheme for crude palm oil (CPO) and its derivative products starting next year. The progressive scheme causes the tax rate to increase if the number of tax objects increases. And the value of the tax object increases. The.

Read More...

MEDC Gas and Steam Power Plant

By administrator | November 6, 2020 | Mining

MEDC Gas and Steam Power Plant. PT Medco Energi Internasional Tbk. (MEDC) spends 32.5 percent of the capital expenditure of US $ 178 million or as much as US $ 58 million (equivalent to Rp. 828.53 billion at an exchange rate of Rp. 14,285) for electricity generation. This expenditure was use through Medco Power to.

Read More...

INTP Focuses on Ready Mix Concrete

By administrator | November 6, 2020 | Basic Industry

INTP Focuses on Ready Mix Concrete. The corona virus pandemic (Covid-19) has not stopped PT Indocement Tunggal Prakarsa Tbk (INTP) from expanding. Finally, through its subsidiary. PT Tarabatuh Manunggal, this cement issuer opened and operated a new andesite mine. Located in the Cariu area, Bogor Regency, West Java, Friday (30/10). Moreover, citing the disclosure of.

Read More...

Steel Pipe Industry of Indonesia Performance

By administrator | November 6, 2020 | Basic Industry

Steel Pipe Industry of Indonesia Performance. PT Steel Pipe Industry of Indonesia Tbk (ISSP) is aiming for a conservative target this year. The steel pipe issuer with the ISSP share code hopes to at least match the performance realization in 2019. As an illustration. The ISSP record sales and service revenues of IDR 4.88 trillion.

Read More...

Malindo Feedmill Operates New Factory

By administrator | November 6, 2020 | Basic Industry

Malindo Feedmill Operates New Factory. As well as Malindo Feedmill Tbk (MAIN) will continue the factory expansion which was delayed, namely the construction of a feed factory in Lampung. MAIN management ensures the development process has start. Andrea Andreas Hendjan, MAIN’s Corporate Secretary. Moreover, he said that previously there were project delays due to several.

Read More...
Translate »
Copy Protected by Chetan's WP-Copyprotect.